In April 2020, Mota Engil carried out the execution works of the foundation piles for the 3 Duques D’alba, for the future commercial wharf of Portimão.
Twelve stray metal tubes, 1100mm in diameter and
11 mm thick, at a depth of 21 meters, with a PVE52M vibrator, supplied by PERTA
Construction Details
WORK: Portimão Marina
CLIENT: Mota Engil
EQUIPMENT: PVE52M+ ICE900+2XPVE100T
TUBES: ᶲ1100mm L=21 m Esp=11mm
MAXIMUM POINT SPTS:
33,44,50,51,60


